Cost Reset
Steps to reset usage cost
Resetting cost is recommended in the following situations,
The Price for a meter is changed in the middle of a billing cycle but that needs to be reflected from the beginning of a billing cycle
Subscription is added to billing lately in the middle of the billing cycle but usage is already collected from the Usage Source for the subscription
When the cost needs to be calculated for the previous billing cycles during a new installation (applicable for the Usage sources that provide the old data). By default, the cost is calculated starting the current billing cycle.
When the cost is reset, the usage is reprocessed based on the current meters from the month selected.
To reset the cost follow the below steps,
Navigate to Reset Page in the Admin portal which is under Billing -> Monitoring
Choose the month from which the usage cost must be reset
Click the 'Reset' button

Use below SQL command against Billing Database to check the Reset operation. Result Status should 200 for all the operations.
Last updated
Was this helpful?